This project was for a direct replacement of a timber structure on a Grade II listed Georgian building.
Clients brief
To replicate the existing timber structure in aluminium.
Constraints
Planning Permission was sought by Alitex working closely with the local conservation officer.
Design considerations
The unique cruciform design had to be maintained whilst accommodating the structural integrity requirement.
Final Design
3D modelling was used to clarify the client's brief and to ultimately satisfy the conservation office.
Alitex involvement
Alitex led this project from start to finish on a turnkey basis.